|
Stage
Technical Information
(Click here for pdf for print)
Contacts:
-
Helen S.
Riger,
Facility Manager
Don Steadman, Technical Director
600 Auditorium Blvd. Daytona Beach, Florida 32118
-
Building
Administration Office (386) 671-3460
Helen S. Riger Office: 386.671.3461
Fax: 386.671.3465
-
Don Steadman
Office: 386.671-3464
Cell: 386.547.7113 Fax: 386.671.3596
-
Technical
Director Office: 386.671.3464
Backstage Phone
-
Box Office:
386.671.3462
Tech Specs
PDFs:
Lighting
System:
DMX 512
-
All
Connectors 3 pin stage type (20A 2p&g)
-
All FOH, Box
Boom & 1st Electric positions are connected through road
patch; 2nd, 3rd, are on 2 p&g bus drops
-
107 4kw
dimmer rack: NSI Colortran I96 and Colortran I24 for
Orchestra Shell
-
Strand GSX
memory console (100 channel 200Q/24 submasters x 5
pages)
-
Also
available: NSI MC7524 (32 submasters)
-
Hardwired
circuits: 28 @ FOH; 8 @ each Box Boom; 40 @ 1st electric
-
3 Run of DMX
from stage to lighting booth. DMX 512 Opto Isolatorc
House
Instruments:
-
48 Par 64
1kw
-
24 6x9
ellipsoidal spotlight (lekos) 1kw
-
28 6x12
lekos 1kw (stage) plus 12 (6 each side)
at Box Booms
-
28 6x16
lekos 1kw at FOH ceiling cove
-
6 Altman
"Far Cyc" 3 color 1kw cyc lights
-
2 Xenon
Strong Super Troupers (in projection booth rear of
balcony)
-
TWO company
drops: each 400A 120/208vac 3-phase fused disconnect (off
stage right)
Sound
Reinforcement System
-
House mix
console: Soundcraft Venue II 32 in x 8 group x 2 mix +_
6 aux (1-4 pre and 6 & 5 post (4 stereo returns)
-
28 stage
mic sends to balcony mix position (7 each corner of
stage)
-
28 channel
3-way mic splitter to DSL box and to balcony monitor mix
position, directs are to house mix console
-
Center
overhead cluster: Furman 3-way Crossover:
-
Lows: 2 -
JBL 18 woofers on Crown 2402
-
Mids: 2-
JBL 15 mid-range on Crown 2402
-
Highs: 4
2 drivers on 2 wide and 2 narrow (balcony) horns on
Crown MT600
-
Two rows
Bose ceiling speakers under balcony on 65 and 75 msec.
Delays
-
Six
monitor wedges: JBL Cabaret 4602B, E120-12, 2505-bullet
powered by three Crown MT 1200
-
House
reinforcement feeds through one Symetrix 501 limiter and
two Klark-Technic 31 band graphic equalizers
-
One Tascam
122 MK3 cassette deck
-
House
Outboard Gear: One Alesis Microverb III 256 preset
digital reverb
-
Compressors: Two Alesis 3630
-
One
Berenger Auto Com Pro, One Berenger Auto Com
-
Three Art
355 Dual 31 band graphic equalizers
-
Microphone
Complement:
- six Shure SM58
- two Shure SM18 mice
- two AKG w/ CK1, CK2, & CK8 capsules
- three AKG 535
- three AKG 310
- two Beyer MCE5 lavs
- one Horison 58 type with switch
- one D112
- four SM 57
- two Cetec-Vega Pro+ Diversity handheld wireless
(170.25 & 171.905 MHz)
- four PCC 160 floor mics
- three Rapco DIs
-
Telex AATI
assistive listening system fed by house mix
-
Tie Lines:
six DSL sends to amp rack, eight returns from house mix
to DSL & DSR
Production
Communication:
Telex intercom
system at SMP to:
TOA mixer amp
#1 at SMP to Lobby w/chime, House monitor mic, and SMP
announce
TOA mixer amp
#2 at SMP to dressing rooms, Lighting booth with spots,
Backstage production office and Atlantic room backstage
SMP Audio
Mixer: Alesis 12R 8 + 2 Stereo Ins; mic lines from stage
boxes (3 per corner of stage) w/feeds to main amp rack
Projection
Equipment:
Bell & Howell 16mm, Eiki 500w Xenon 16mm, in spot booth;
stage screen 20 x 30
Stage Drapes:
Black Velor; four sets legs 28 four borders 10x60, two
fill stage travelers 28, one 30x60 Rosco Cyc Screen
(white), maroon main curtain (lineset #2), Fire curtain (lineset
#1) (maroon valance hung from same)
Stage
Counterweight System:
Single purchase 8: O.C. Tee track, 8 arbors
Operates from stage left at deck level, 2 bridges
35 total linesets
Grid Height: 51 high trim out 440
Orchestra Riser: Wenger 4 x 8 folding type:
Five 8 high
Seven 6 high
Nine 24 high
100 stacking padded chairs
100 Wenger music stands
25 stand lights
3 30 padded stools
1 4 x 4 conductor podium
Orchestra Shell: Wenger full stage enclosure; 10
walls and 4 ceiling pieces, built-in overhead fixtures
distribute 18k quartz lighting, 3 entrance door sets per
side
Orchestra Pit Cover: Manual 9 x 47
Pianos: Steinway Concert Grand
Stage
Power:
One 400 amp three-phase for lighting
One 400 amp three-phase for sound
Stage Dimension:
Proscenium:
Height 22'0"
Width 47'0"
Stagehouse:
Width 82'0"
Depth 35'0"
Apron 3'3"
Loading Dock: Upstage right rear wall through 9'x 14'
rollup door
at stage floor level; covered 12'x 15' dock @ 14"
above rear parking lot level
Dressing
Rooms:
Two star
and Green Room offstage left at stage level, Three
chorus and two smaller off stage left and 1 flight up
Washer and Dryer and 3-bin sink for hand washables are
available for production use.
Adequate
parking for production vehicles is available.
Additional
Rooms
(Atlantic
floorplan 1)
(Altantic floorplan 2)
Peabody
Auditorium Lineset Schedule
Click here for House Lighting Plot
Lineset # Use Distance
Upstage edge of proscenium opening 00'0"
00 Fire curtain/main valance 00'6"
01 Main Curtain 01'4"
02 #1 Electric (permanently wired) 02'4"
03 Open lineset 03'4"
04 #1 Orchestra shell ceiling (permanent) 04'6"
05 Border or open lineset 06'6"
06 Legs or open lineset 07'10"
07 Open linset 09'8"
08 Mid-stage black traveller (permanent) 10'3"
09 Open lineset or projection screen 10'8"
10 Open lineset 11'6"
11 #2 Orchestra shell ceiling (permanent) 12'4"
12 Border or open lineset 13'3"
13 Legs or open lineset 14'0"
14 #2 Electric 15'2"
15 Open lineset 15'10"
16 Open lineset 17'2"
17 Open lineset 17'6"
18 Open lineset 17'11"
19 Open lineset 18'7"
20 Legs or open lineset 19'2"
21 #3 Orchestra shell ceiling (permanent) 20'0"
22 Boeder or open lineset 21'2"
23 3rd Electric 22'4"
24 Open lineset 23'3"
25 Open lineset 23'9"
26 Legs or open lineset 24'2"
27 #4 Electric (Cyc lights) 25'2"
28 Open lineset 26'2"
29 #4 Orchestra shell ceiling (permanent) 27'4"
30 Open lineset 29'0"
31 Open lineset 29'8"
32 Open lineset 30'4"
33 Open lineset 31'2"
34 Upstage Black traveller 32'4"
35 Cyc (Rosco cyc screen) 32'10"
-All pipes fly out to 44' above stage deck
-Proscenium arch opening: 47'0" & 22'0" high
-Stage apron edge to rear wall: 38'
-Centerline to SL locking rail: 38'
-Centerline to SR wall: 40'
|